Waterfall Reconstruction

Posted by:

The team was working at a site in Cambridge for several weeks completing everything from a cottage garden on the front boulevard to a billowing woodland garden in the backyard under the canopy of a newly planted Pyrus calleryana. The last step to complete the backyard space was to repair the existing water fall feature.

Aaron, Charles and Owen worked together to complete the project. Aaron’s attention to detail and diverse knowledge in water hydraulics lead the team’s success. The following photos credit their recent work.

Waterfall feature with existing statuary and bridge feature

Waterfall feature with existing statuary and bridge

image

Waterfall with existing statuary

 

 

 

 

 

 

 

 

 

 

 

 

Please note: All materials were existing and had to be re-used. 

0

About the Author: